Render: Ottavio di Blasio – ODB
The works for the refurbishment of the buildings from the 30s will start soon. The intervention involves the university campus based in via Celoria 10, Milan, and includes the construction of two new buildings that will host exhibition spaces, educational rooms and a conference room.
The two-phase project will start with the complete refurbishment of the historical building by 2025 followed by the creation of two new spaces dedicated to the educational function of the new campus, Labonof + Musa Anthropological Museum and the vault which will be used as a knowledge archive.
Tekser will oversee MEP systems design which will be focused on energy efficiency through both active and passive solutions such as the implementation of a new centralized heating and cooling system with geothermal heat pumps, the replacement of doors and windows, the dehumidification of the basement and the insulation of horizontal surfaces.