Informazioni relative al progetto
CLIENT
Alinvest
TIPO DI INTERVENTO
New Construction
LOCATION
Via Stephenson 55, Milano
DURATION
2008 – 2012
SERVICES
- Preliminary MEP Design
- Final MEP Design
- Specialist Works Supervision for Building Services
- MEP Systems Testing and CommissioninG
Information about the Hospitality Facility
|
Air-conditioned area: |
15.000 mq |
| Number of rooms: |
308 |
| Facilities: |
Restaurant, meeting room, wellness centre, lounge bar |
| Value of works: |
8.965.000 € |
Project Description
Our company was appointed to carry out the Preliminary and Final MEP Design, followed by the Specialist Works Supervision for Building Services and the related testing and commissioning of the completed systems.
The electrical and special systems included the installation of conduits for electrical, audio, video and telecommunication cables, bases and metalwork for equipment, excavations, shafts and core drilling, as well as lead shielding for rooms exposed to magnetic fields.
The mechanical systems included integration with the electrical systems through power and auxiliary lines between peripheral units and equipment.
This also included accessible power outlets compliant with regulations on architectural barriers, such as CEE sockets with interlocked switches, 10/16 A wall sockets with protected contacts, and safety switches installed near the equipment.
This highlights the interconnection and safety of the heating, ventilation, air conditioning, and plumbing systems designed for the facility.
Leed Platinum