The Big / Milano Verticale

Project Information

CLIENT

UnipolSai

TYPE OF INTERVENTION

Refurbishment

LOCATION

Via carlo de Cristoforo 6/8, Milan

DURATION

2016 – 2018

SERVICES

  • Preliminary MEP Design
  • Final MEP Design
  • Executive MEP Design
  • Specialist Works Supervision for Building Services

Information about the Hospitality Facility

Area:

8.900 mq

Number of rooms:

173

Facilities:

Private internal garden, event area, panoramic rooftop
Value of works:

€6,300,000

BimBim

PROJECT DESCRIPTION

The project involved the complete refurbishment of all MEP systems, as well as Specialist Works Supervision for Building Services.

Tekser S.r.l. was responsible for refurbishing all building services systems and implementing high-efficiency mechanical systems for the hotel. These included multipurpose groundwater units and high-temperature heat pumps designed for the simultaneous production of hot and chilled water.

The modular, self-contained Air Handling Units (AHUs) are equipped with heat recovery units, high-efficiency filters and plug fans. A centralized Building Automation and Control System (BACS) manages, supervises and monitors the systems, including diagnostics, through a web-based interface.

Distribution is carried out through ducted networks and insulated steel, copper and multilayer piping. The project also includes water treatment systems, a complete fire protection system and diversified room terminals.

All building services units comply with CE, ISO 9001 and ISO 14001 standards.